FINANCING
As low as 12 month 0% APR
A stunning greige painted cabinet with high-end features. Ships in 2-5 Business Days
Basic kitchen starts at $4,467.91
$3,127.54
Friends & Family | Save 30%!| Face Frames | 1-1/2” x 3/4" Solid Wood Mortise & Tenon Construction |
| Box Construction | 1/2” Plywood Box |
| Shelves | Adjustable 3/4" Thick Plywood |
| Doors | 5-Piece HDF Door, Recessed Panel, Full Overlay |
| Drawer Fronts | 5-Piece, Recessed Panel, Full Overlay |
| Drawer Glides | Full-Extension Soft Closing Undermount Concealed Drawer Glide |
| Drawer Boxes | Dovetail with 5/8" Solid Wood Sides and 3/8" Plywood Bottom |
| Hinges | 6-Way-Adjustable, Fully Concealed with Soft Close Integrated Hinge |
| Interior | Natural Maple Finish |
| Exposed Sides | Finished to Match |
| Filler | A Minimum 1/2" of Filler is Needed Between any Walls or Deep Cabinets And The Base or Wall Cabinets. |
| Assembly | Metal Clips, Glue and Staples |
Couldn't load pickup availability
9" Wide Single Door, One Drawer | (9"W x 34.5"H x 24"D)
Couldn't load pickup availability
12" Wide Single Door, One Drawer | (12"W x 34.5"H x 24"D)
Couldn't load pickup availability
15" Wide Single Door, One Drawer | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Single Door, One Drawer | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawers | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36" Wide Double Doors, Two Drawers | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
12" Wide Three Drawers | (12"W x 34.5"H x 24"D)
Couldn't load pickup availability
15" Wide Three Drawers | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Three Drawers | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
21" Wide Three Drawers | (21"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Three Drawers | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Three Drawers | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer Front | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawer Fronts | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36" Wide Double Doors, Two Drawer Fronts | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
42" Wide Double Doors, Two Drawer Fronts | (42"W x 34.5"H x 24"D)
Couldn't load pickup availability
33"Wide Corner Cabinet with Lazy Susan | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36"Wide Corner Cabinet with Lazy Susan | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
33"Wide Easy Reach Corner Cabinet with Shelf | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36"Wide Easy Reach Corner Cabinet with Shelf | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
Reversible Blind Corner Cabinet | (39"W x 34.5"H x 24"D)
Recommended Install 42" - 45"
Couldn't load pickup availability
15" Wide Single Door, One Drawer, One 35-qt bin included | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
6" Wide Single Door, No Drawer with Pullout Unit | (6"W x 34.5"H x 24"D)
Not Soft Closing
Couldn't load pickup availability
9" Wide Single Door, No Drawer with Pullout Unit | (9"W x 34.5"H x 24"D)
Not Soft Closing
Couldn't load pickup availability
15" Wide Single Door, One Drawer, Two Roll Outs | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Single Door, One Drawer, Two Roll Outs | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
21" Wide Single Door, One Drawer, Two Roll Outs | (21"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer, Two Roll Outs | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer, Two Roll Outs | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer, Two Roll Outs | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawers, Two Roll Outs | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
Sort by cabinet type to find each item
Once you’re ready to check out, hit “Secure Checkout.”
Horizon Sand cabinets are premium ready-to-assemble (RTA)
kitchen cabinets featuring a clean shaker design in a warm greige painted
finish. They are built with solid wood face frames, durable plywood cabinet
boxes, dovetailed drawer boxes, and soft-close doors and drawers. The extremely
durable painted finish is designed to withstand everyday kitchen use.
Horizon Sand is a clean shaker cabinet with a simple
recessed center panel and crisp, balanced lines. The greige color blends gray
and beige, making it one of the most versatile neutral cabinet finishes
available. It works well in transitional, modern farmhouse, and contemporary
kitchens.
Horizon Sand cabinets are ideal for kitchens that want a
soft neutral tone with warmth and depth. They pair beautifully with white
quartz, marble-look countertops, and matte black or brushed metal hardware.
This color works especially well in open layouts and island-centered designs.
Horizon Sand cabinets combine all-wood construction with
dovetailed drawers and a highly durable painted finish at an RTA price point.
They provide long-lasting performance without the cost or lead times of custom
cabinetry.
Yes, Horizon Sand cabinets are designed for straightforward
RTA assembly using a secure metal clip system. Pre-drilled components and clear
assembly videos make the process efficient for most homeowners.
Pricing depends on layout and cabinet selection, but Horizon
kitchens typically cost significantly less than custom cabinetry. You still
receive premium materials and soft-close features.
Horizon Sand cabinets are available in base, wall, tall, and
specialty configurations, including pantry and corner cabinets. This allows
flexible kitchen design for nearly any layout.
Yes, Horizon supports rollout shelves, spice pull-outs,
trash pull-outs, lazy Susans, and decorative panels to improve organization and
functionality.
The Horizon collection is available in Sand (greige), Sage,
White, Blue, Ivory (painted finishes), Toffee and Espresso (stained finishes),
and Unfinished (ready to paint or stain).
Most Horizon cabinets ship in as little as 1–5 business
days.
Designing a kitchen on your own can get overwhelming. That’s where our design team comes in! Work 1-on-1 with a pro kitchen designer who learns ALL about your wants and needs — then draws up your dream kitchen.
Or give us a call: 800-788-7575
Mon-Thurs 9 AM - 6 PM EST | Fri 9 AM -2 PM EST