FINANCING
As low as 12 month 0% APR
A stunning grey 2-step shaker cabinet with high-end features. Ships in 2-5 Business Days
Basic kitchen starts at $4,601.92
$3,221.34
Veterans Day Sale | Save 30%!| Face Frames | 1-1/2” x 3/4" Solid Wood Mortise & Tenon Construction |
| Box Construction | 1/2” Plywood Box |
| Shelves | Adjustable 3/4" Thick Plywood |
| Doors | Solid Wood Maple Stiles, MDF Center Panel, 5-Piece, Recessed Panel, Full Overlay |
| Drawer Fronts | 5-Piece, Recessed Panel, Full Overlay |
| Finish | A Minimum 1/2" of Filler is Needed Between any Walls or Deep Cabinets and the Base or Wall Cabinets. |
| Drawer Glides | Full-Extension Soft Closing Undermount Concealed Drawer Glide |
| Drawer Boxes | Dovetail With 5/8" Solid Wood Sides and 3/8" Plywood Bottom |
| Hinges | 6-Way-Adjustable, Fully Concealed With Soft Close Integrated Hinge |
| Interior | Natural Maple Finish |
| Exposed Sides | Finished to Match |
| Assembly | Metal Clips, Glue and Staples |
Couldn't load pickup availability
9" Wide Single Door, One Drawer | (9"W x 34.5"H x 24"D)
Couldn't load pickup availability
12" Wide Single Door, One Drawer | (12"W x 34.5"H x 24"D)
Couldn't load pickup availability
15" Wide Single Door, One Drawer | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Single Door, One Drawer | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawers | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36" Wide Double Doors, Two Drawers | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
12" Wide Three Drawers | (12"W x 34.5"H x 24"D)
Couldn't load pickup availability
15" Wide Three Drawers | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Three Drawers | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
21" Wide Three Drawers | (21"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Three Drawers | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Three Drawers | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer Front | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawer Fronts | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36" Wide Double Doors, Two Drawer Fronts | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
42" Wide Double Doors, Two Drawer Fronts | (42"W x 34.5"H x 24"D)
Couldn't load pickup availability
33"Wide Corner Cabinet with Lazy Susan | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36"Wide Corner Cabinet with Lazy Susan | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
33"Wide Easy Reach Corner Cabinet with Shelf | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
36"Wide Easy Reach Corner Cabinet with Shelf | (36"W x 34.5"H x 24"D)
Couldn't load pickup availability
Reversible Blind Corner Cabinet | (39"W x 34.5"H x 24"D)
Recommended Install 42" - 45"
Couldn't load pickup availability
27" Wide Base Cabinet with One Drawer below Microwave Opening | (27"W x 34.5"H x 24"D) Opening 24"W x 15.5"H
Couldn't load pickup availability
15" Wide Single Door, One Drawer, One 35-qt bin included | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
6" Wide Single Door, No Drawer with Pullout Unit | (6"W x 34.5"H x 24"D)
Not Soft Closing
Couldn't load pickup availability
9" Wide Single Door, No Drawer with Pullout Unit | (9"W x 34.5"H x 24"D)
Not Soft Closing
Couldn't load pickup availability
15" Wide Single Door, One Drawer, Two Roll Outs | (15"W x 34.5"H x 24"D)
Couldn't load pickup availability
18" Wide Single Door, One Drawer, Two Roll Outs | (18"W x 34.5"H x 24"D)
Couldn't load pickup availability
21" Wide Single Door, One Drawer, Two Roll Outs | (21"W x 34.5"H x 24"D)
Couldn't load pickup availability
24" Wide Double Doors, One Drawer, Two Roll Outs | (24"W x 34.5"H x 24"D)
Couldn't load pickup availability
27" Wide Double Doors, One Drawer, Two Roll Outs | (27"W x 34.5"H x 24"D)
Couldn't load pickup availability
30" Wide Double Doors, One Drawer, Two Roll Outs | (30"W x 34.5"H x 24"D)
Couldn't load pickup availability
33" Wide Double Doors, Two Drawers, Two Roll Outs | (33"W x 34.5"H x 24"D)
Couldn't load pickup availability
Sort by cabinet type to find each item
Once you’re ready to check out, hit “Secure Checkout.”
Designing a kitchen on your own can get overwhelming. That’s where our design team comes in! Work 1-on-1 with a pro kitchen designer who learns ALL about your wants and needs — then draws up your dream kitchen.
Or give us a call: 800-788-7575
Mon-Thurs 9 AM - 6 PM EST | Fri 9 AM -2 PM EST